Hillside Ave. Bridge Replacement (Berlin, NH):

Ray's Electric and General Contracting Inc. was awarded the 2018 contract to replace the Hillside Ave. Bridge that crosses the Dead River in Berlin, NH. Work began during the Summer of 2018 and included precast bridge installation, excavation, a forced sewer main, and installation of a temporary dam, culverts, and silt fence to reroute the river. Project was completed early Fall of 2018.